Skip to content
BUSINESSES / ENERGY / BIO-CBG
Photo: Wikimedia Commons
BUSINESSES / ENERGY / BIO-CBG

BIO-CBG — ORGANIC WASTE TO VEHICLE-GRADE FUEL

Compressed Biogas plants from 5 to 150 TPD, aligned with India’s SATAT mission — with FCO-certified organic manure and optional food-grade CO₂ as additional revenue.

EXPLORE A CBG PLANT
5–150
TPD PLANT RANGE
95%+
METHANE AFTER PURIFICATION
25–30
DAY DIGESTION CYCLE
3
REVENUE STREAMS — CBG, FOM, CO₂
WHO WE WORK WITH

THREE WAYS INTO CBG

A CBG plant only works when the entrepreneur, the land and the feedstock all line up. We structure all three.

BUSINESS ENTREPRENEURS

Feasibility, mass balance and bank-ready DPRs; SATAT registration and MNRE/state subsidy applications; plant engineering, equipment sourcing, construction and 12-month operations support.

LAND OWNERS

Turn idle land into long-term energy revenue — site assessment, lease and JV structures, plant development and offtake arrangements handled end to end.

FARMERS & FPOs

Assured purchase of paddy straw, Napier grass, cattle dung and agri residue as feedstock — with FCO-certified fermented organic manure returned to the field.

WHAT GOES IN
FEEDSTOCK

WHAT GOES IN

Agricultural residue, cattle dung, Napier grass, food and market waste, press mud and segregated MSW — each with its own gas yield, pre-treatment route and contracting model. We build the feedstock plan before the plant.

  • Yield testing (VS/TS) and mass balance
  • Multi-feed digester design
  • Aggregation and storage logistics
  • Long-term feedstock supply agreements
PROCESS

HOW A BIO-CBG PLANT WORKS

01
Feedstock & Pre-treatment
Weighing, VS/TS testing, shredding, slurry mixing
02
Anaerobic Digestion
25–30 day HRT, raw biogas 55–65% CH₄
03
Purification
H₂S scrubbing, CO₂ removal — 95%+ methane
04
Compression
200–250 bar cascade filling
05
FOM Manure
FCO-certified organic manure revenue
06
CO₂ Capture
Optional food-grade CO₂ revenue stream

WANT THE NUMBERS ON A CBG PLANT?

We will model your feedstock, capex and SATAT offtake into a bank-ready DPR.

REQUEST A CBG DPR
ENERGY WIRE
Brent crude steadies as OPEC+ holds output guidance for Q3 2026  •  India CNG station count crosses 8,000 as city gas expansion accelerates  •  Global LNG demand projected to grow through 2040, led by Asia  •  Nigeria advances gas-to-power programme with new regas capacity  •  Compressed Biogas (CBG) blending obligation drives new plant investment in India  •  UAE expands downstream capacity with fresh EPC awards Brent crude steadies as OPEC+ holds output guidance for Q3 2026  •  India CNG station count crosses 8,000 as city gas expansion accelerates  •  Global LNG demand projected to grow through 2040, led by Asia  •  Nigeria advances gas-to-power programme with new regas capacity  •  Compressed Biogas (CBG) blending obligation drives new plant investment in India  •  UAE expands downstream capacity with fresh EPC awards