End-to-end gas infrastructure — from land acquisition and licensing to live dispensing and long-term O&M. One team, one contract, zero gaps.
Complete CNG station development — from the first site visit and land negotiation, through PNGRB, PESO, fire NOC and every regulatory clearance, to the moment your dispenser activates. In Nigeria we handle NMDPRA & DPR clearances. 200+ stations delivered.
Online (mother) stations up to 4,000 kg/hr, daughter-booster stations, CNG-cum-retail outlets and captive fleet stations — land to live dispensing on one turnkey contract.
City gas distribution and cross-country pipeline infrastructure — route surveys, engineering, laying, testing and commissioning with full HSE compliance.
CNG/gas generator packages for hotels, industry and estates — like our 600 kVA gas genset installations in Abuja — including pressure-reduction gas trains, installation and OEM commissioning.
LNG infrastructure for markets beyond the pipeline grid — liquefaction plants, regasification stations and regas-fed power projects, delivered as integrated EPC packages.
We design and deliver Bio-CBG plants converting agricultural residue, cattle dung, Napier grass, food waste, press mud and MSW into vehicle-grade fuel — fully aligned with India's SATAT mission, from 5 TPD farm plants to 150 TPD industrial facilities, plus FCO-certified organic manure revenue.
Feasibility, mass balance and bank-ready DPRs; SATAT registration, MNRE/state subsidies; plant engineering, equipment sourcing, build and 12-month operations support.
Turn idle land into long-term energy revenue — site assessment, lease and JV structures, plant development and offtake arrangements handled end to end.
Assured purchase of paddy straw, Napier grass, cattle dung and agri residue as plant feedstock — plus FCO-certified fermented organic manure back to the field.
From concept and DPR through engineering, procurement, construction management and operations — one accountable consultant across the full project life cycle. Parallel-track execution cuts commissioning time by up to 35% versus industry average.
DISCUSS YOUR PROJECT