Skip to content
Illuminated LNG plant at night
Photo: Wikimedia Commons
INVESTORS

INVEST IN THE CLEAN-FUEL CORRIDOR

CNG, LNG and Bio-CBG demand is compounding across India and West Africa. OMTECHSYS offers investors direct participation in bankable, revenue-generating energy infrastructure.

OPEN THE INVESTMENT CALCULATOR
200+
CNG STATIONS BUILT
40K+
VEHICLES CONVERTED
15+
YEARS IN ENERGY INFRA
35%
FASTER COMMISSIONING VS INDUSTRY AVG.
WHY NOW

THE OPPORTUNITY

INDIA — CITY GAS & SATAT

City gas distribution rounds keep expanding the CNG station network, while the SATAT mission and CBG blending obligations create assured offtake for compressed biogas plants.

NIGERIA — GAS TO POWER

Nigeria's shift from diesel to gas — for generation, transport and industry — is driving demand for CNG stations, conversions and gas gensets, where we already operate from Abuja.

CROSS-BORDER TRADE

An established India–Nigeria trade desk in commodities and machinery adds a cash-generating vertical alongside long-cycle infrastructure builds.

MODELS

WAYS TO PARTICIPATE

01
CNG Station Ownership

Own and operate a station we build — DPR, financing support and O&M included.

02
CBG Plant JV

Joint ventures on Bio-CBG plants with SATAT offtake and FOM manure revenue.

03
Project Finance

Debt or equity participation in specific energy and infrastructure projects.

04
Trade Partnership

Working-capital partnerships on certified commodity and machinery trade flows.

TOOL

INVESTMENT CALCULATOR

Pick a scheme, answer three questions, and see an indicative return profile built on our delivered-project benchmarks. Illustrative only — see the terms below.

LIVE FX USD/INR USD/NGN USD/AED connecting…
STEP 1 — CHOOSE YOUR INVESTMENT
Q1 — HOW MUCH DO YOU WANT TO DEPLOY?
 
 
  
Q2 — HOLDING HORIZON
Q3 — TARGET MARKET
 
INDICATIVE RETURN PROFILE
 
 
CAPITAL DEPLOYED
 
ANNUAL EBITDA (INDICATIVE)
 
INDICATIVE YIELD P.A.
 
PAYBACK PERIOD
 
5-YEAR CUMULATIVE
 
TERMS & CONDITIONS
  1. All figures produced by this calculator are indicative illustrations generated from OMTECHSYS benchmark assumptions for comparable delivered projects. They are not an offer, a quotation, a forecast, or a promise of performance.
  2. Actual outcomes depend on site, feedstock and gas availability, statutory approvals, gas and feedstock pricing, offtake volumes, subsidy eligibility, currency movement, interest costs, taxes and duties — none of which are captured here.
  3. No return is guaranteed or assured. Where a fixed-return scheme is illustrated, any fixed rate applies only if and as set out in a signed, executed agreement, and remains subject to the counterparty's performance.
  4. Figures are pre-tax and exclude working capital, financing costs, land cost where not stated, insurance, and statutory levies unless expressly included in a project-specific DPR.
  5. Any investment will be governed solely by the definitive transaction documents executed between the parties; those documents prevail over anything shown on this website.
  6. Eligibility, minimum ticket size and jurisdiction-specific restrictions apply. Cross-border participation is subject to applicable FEMA/RBI, NMDPRA and local regulatory approvals.
  7. Currency conversion uses live mid-market reference rates from a third-party exchange-rate feed, refreshed periodically while this page is open. Rates are indicative reference rates only, are not dealable rates, exclude spreads, bank charges and transaction costs, and may differ from the rate any bank or authorised dealer applies. OMTECHSYS does not warrant the accuracy, completeness or availability of third-party rate data.
  8. OMTECHSYS may revise these assumptions at any time without notice.
DISCLAIMER

This tool is provided for information and preliminary discussion only. It does not constitute investment, financial, legal, tax or accounting advice, nor a solicitation to buy or subscribe to any security, unit, deposit or instrument in any jurisdiction. Energy infrastructure investments carry risk, including the risk of partial or total loss of capital and of illiquidity. Past project performance is not indicative of future results. Prospective investors should conduct independent due diligence and obtain advice from qualified professional advisers before committing capital. OMTECHSYS, its directors, employees and affiliates accept no liability for any loss arising from reliance on the outputs of this calculator.

REQUEST THE INVESTOR PACK

Detailed financials, project pipeline and partnership structures — under NDA.

GET IN TOUCH
ENERGY WIRE
Brent crude steadies as OPEC+ holds output guidance for Q3 2026  •  India CNG station count crosses 8,000 as city gas expansion accelerates  •  Global LNG demand projected to grow through 2040, led by Asia  •  Nigeria advances gas-to-power programme with new regas capacity  •  Compressed Biogas (CBG) blending obligation drives new plant investment in India  •  UAE expands downstream capacity with fresh EPC awards Brent crude steadies as OPEC+ holds output guidance for Q3 2026  •  India CNG station count crosses 8,000 as city gas expansion accelerates  •  Global LNG demand projected to grow through 2040, led by Asia  •  Nigeria advances gas-to-power programme with new regas capacity  •  Compressed Biogas (CBG) blending obligation drives new plant investment in India  •  UAE expands downstream capacity with fresh EPC awards